Quick Answer
DON27BZ01-NV005 is a Navy SBIR Phase I topic in DoW SBIR 2027 BAA Release 1 for a compact cooling unit (chiller, pump, piping, instrumentation, and controls) that supplies about 65 F water to cool DDG 51 electronics more efficiently than the ship's 42 F chilled water system. Phase I is up to $315,000 including the option, closing November 25, 2026 at 12:00 p.m. ET.
There are no Navy-qualified intermediate temperature chillers today. The Navy estimates about 200 refrigeration tons of load could move to an intermediate loop.
Topic at a Glance
Topic number: DON27BZ01-NV005
Title: Intermediate Temperature Cooling Unit
Component: Department of the Navy
Solicitation: DoW SBIR 2027 BAA, Release 1
Program and phase: SBIR Phase I
Award ceiling: $315,000
Period of performance: 6 month base plus 6 month option
Technical volume limit: 10 pages
Projected CMMC level: Level 2 (Self)
Export control: Not marked as ITAR restricted on DSIP
Focus areas: Sustainment and Logistics
Keywords: electronic cooling water, energy efficiency, chiller, HVAC, thermal management
Pre-release: October 7, 2026
Opens: October 28, 2026
Closes: November 25, 2026 at 12:00 p.m. ET
Submission portal: DSIP at dodsbirsttr.mil
What the Navy Is Looking For
DDG 51 destroyers are approaching their power and cooling limits. Running all electronics on 42 F chilled water consumes significant power and causes condensation that can create electrical hazards. Equipment that tolerates warmer water could be served by a more efficient intermediate loop, preserving margin for future upgrades.
The unit must have a small footprint, meet Navy shock, noise, vibration, EMI, reliability, and maintainability standards, and be galvanically compatible with copper-nickel piping. Cooling mediums may include water, seawater, or glycol mixes. Proposers define cooling capacity, efficiency, power draw, output pressure and flow, and not-to-exceed dimensions.
How the Phases Are Structured
Phase I develops a concept and shows it can meet Navy needs and become a useful product. The Option covers initial prototype design specifications.
Phase II delivers a prototype, demonstrates capacity, efficiency, power draw, pressure, and flow, participates in extended testing at a maritime facility, and prepares a manufacturing and development plan.
Phase III supports Navy transition with installation and maintenance manuals. Commercial markets include maritime, industrial facility cooling, and data centers.
Funding and Proposal Limits
Phase I Base: up to $200,000 over 6 months.
Phase I Option: up to $115,000 over 6 months, so the Phase I total is up to $315,000. Base and Option costs must be separated in Volume 3.
Phase II: up to $2,000,000 including all options and TABA, with structure provided to Phase I awardees.
Technical Volume (Volume 2) limit: 10 pages, 10-point minimum font, and the Option tasks must be inside the 10 pages.
TABA: up to $6,500 for Phase I, in addition to the Phase I amount. Cost sharing is not accepted on Navy Phase I proposals.
Who Is Eligible
You must be a U.S. small business concern that meets SBIR ownership and size rules at the time of award.
Your firm must perform at least two-thirds of the work in both the Phase I Base and the Option. The Navy does not accept deviations from this rule for Phase I.
Firms more than 50 percent owned by multiple venture capital operating companies, hedge funds, or private equity firms are eligible to propose to Navy topics.
DoW now limits proposals on a per-topic basis, so plan on one strong proposal for this topic.
Key Dates and How to Apply
Now through October 28, 2026: pre-release. Topic authors are listed on the DSIP Topics and Topic Q&A page and you can call or email them directly with technical questions. This is the only window for direct contact.
October 28, 2026: the topic opens for proposals in the Defense SBIR/STTR Innovation Portal (DSIP). After this date, questions go through DSIP Topic Q&A only.
November 25, 2026 at 12:00 p.m. ET: complete proposals must be certified and submitted in DSIP. A proposal still marked In Progress or Ready to Certify is not considered submitted.
Before you submit, confirm an active SAM.gov registration, a DSIP account, completed Volume 6 Fraud, Waste, and Abuse training, and the Volume 7 foreign affiliation disclosure webform.
Is This Topic a Fit for Your Company?
HVAC and chiller manufacturers, marine thermal management firms, and data center cooling companies looking for a defense entry point fit well. Experience with shock-qualified or naval equipment is a plus.
BW&CO has helped deep tech founders secure $350M+ in non-dilutive funding. If you want a second opinion on fit, feasibility documentation, or a proposal plan before the deadline, book a call with our team below.
Frequently Asked Questions
What is Navy SBIR topic DON27BZ01-NV005?
DON27BZ01-NV005 is a Navy SBIR Phase I topic in DoW SBIR 2027 BAA Release 1 for a compact intermediate temperature cooling unit supplying about 65 F water to cool DDG 51 shipboard electronics.
How much funding is available?
Phase I has a Base of up to $200,000 over 6 months and an Option of up to $115,000 over 6 months, for up to $315,000 total. Phase II can be up to $2,000,000 including options and TABA.
When is the deadline?
The topic pre-released October 7, 2026, opens October 28, 2026, and closes November 25, 2026 at 12:00 p.m. ET in DSIP.
How long can the technical volume be?
Navy Phase I technical volumes are limited to 10 pages, with a 10-point minimum font, and the Phase I Option tasks must fit inside those 10 pages.
Why an intermediate temperature?
Running warmer water than the 42 F chilled water system uses less energy, reduces condensation hazards, and preserves power and cooling margin for future DDG 51 upgrades.
Can I talk to the topic author?
Yes, during pre-release only, from October 7 until the topic opens on October 28, 2026. After that, questions go through DSIP Topic Q&A.
Ready to read the full topic? Read the official topic on DSIP.