Navy SBIR DON27BZ01-NV005: Intermediate Temperature Cooling Unit
Quick Answer
DON27BZ01-NV005 is a Navy SBIR Phase I topic in DoW SBIR 2027 BAA Release 1 for a compact cooling unit (chiller, pump, piping, instrumentation, and controls) that supplies about 65 F water to cool DDG 51 electronics more efficiently than the ship's 42 F chilled water system. Phase I is up to $315,000 including the option, closing November 25, 2026 at 12:00 p.m. ET.
There are no Navy-qualified intermediate temperature chillers today. The Navy estimates about 200 refrigeration tons of load could move to an intermediate loop.
Topic at a Glance
- Topic number: DON27BZ01-NV005
- Title: Intermediate Temperature Cooling Unit
- Component: Department of the Navy
- Solicitation: DoW SBIR 2027 BAA, Release 1
- Program and phase: SBIR Phase I
- Award ceiling: $315,000
- Period of performance: 6 month base plus 6 month option
- Technical volume limit: 10 pages
- Projected CMMC level: Level 2 (Self)
- Export control: Not marked as ITAR restricted on DSIP
- Focus areas: Sustainment and Logistics
- Keywords: electronic cooling water, energy efficiency, chiller, HVAC, thermal management
- Pre-release: October 7, 2026
- Opens: October 28, 2026
- Closes: November 25, 2026 at 12:00 p.m. ET
- Submission portal: DSIP at dodsbirsttr.mil
What the Navy Is Looking For
DDG 51 destroyers are approaching their power and cooling limits. Running all electronics on 42 F chilled water consumes significant power and causes condensation that can create electrical hazards. Equipment that tolerates warmer water could be served by a more efficient intermediate loop, preserving margin for future upgrades.
The unit must have a small footprint, meet Navy shock, noise, vibration, EMI, reliability, and maintainability standards, and be galvanically compatible with copper-nickel piping. Cooling mediums may include water, seawater, or glycol mixes. Proposers define cooling capacity, efficiency, power draw, output pressure and flow, and not-to-exceed dimensions.
How the Phases Are Structured
Phase I develops a concept and shows it can meet Navy needs and become a useful product. The Option covers initial prototype design specifications.
Phase II delivers a prototype, demonstrates capacity, efficiency, power draw, pressure, and flow, participates in extended testing at a maritime facility, and prepares a manufacturing and development plan.
Phase III supports Navy transition with installation and maintenance manuals. Commercial markets include maritime, industrial facility cooling, and data centers.
Funding and Proposal Limits
- Phase I Base: up to $200,000 over 6 months.
- Phase I Option: up to $115,000 over 6 months, so the Phase I total is up to $315,000. Base and Option costs must be separated in Volume 3.
- Phase II: up to $2,000,000 including all options and TABA, with structure provided to Phase I awardees.
- Technical Volume (Volume 2) limit: 10 pages, 10-point minimum font, and the Option tasks must be inside the 10 pages.
- TABA: up to $6,500 for Phase I, in addition to the Phase I amount. Cost sharing is not accepted on Navy Phase I proposals.
Who Is Eligible
- You must be a U.S. small business concern that meets SBIR ownership and size rules at the time of award.
- Your firm must perform at least two-thirds of the work in both the Phase I Base and the Option. The Navy does not accept deviations from this rule for Phase I.
- Firms more than 50 percent owned by multiple venture capital operating companies, hedge funds, or private equity firms are eligible to propose to Navy topics.
- DoW now limits proposals on a per-topic basis, so plan on one strong proposal for this topic.
Key Dates and How to Apply
- Now through October 28, 2026: pre-release. Topic authors are listed on the DSIP Topics and Topic Q&A page and you can call or email them directly with technical questions. This is the only window for direct contact.
- October 28, 2026: the topic opens for proposals in the Defense SBIR/STTR Innovation Portal (DSIP). After this date, questions go through DSIP Topic Q&A only.
- November 25, 2026 at 12:00 p.m. ET: complete proposals must be certified and submitted in DSIP. A proposal still marked In Progress or Ready to Certify is not considered submitted.
- Before you submit, confirm an active SAM.gov registration, a DSIP account, completed Volume 6 Fraud, Waste, and Abuse training, and the Volume 7 foreign affiliation disclosure webform.
Is This Topic a Fit for Your Company?
HVAC and chiller manufacturers, marine thermal management firms, and data center cooling companies looking for a defense entry point fit well. Experience with shock-qualified or naval equipment is a plus.
BW&CO has helped deep tech founders secure $350M+ in non-dilutive funding. If you want a second opinion on fit, feasibility documentation, or a proposal plan before the deadline, book a call with our team below.
Frequently Asked Questions
What is Navy SBIR topic DON27BZ01-NV005?
DON27BZ01-NV005 is a Navy SBIR Phase I topic in DoW SBIR 2027 BAA Release 1 for a compact intermediate temperature cooling unit supplying about 65 F water to cool DDG 51 shipboard electronics.
How much funding is available?
Phase I has a Base of up to $200,000 over 6 months and an Option of up to $115,000 over 6 months, for up to $315,000 total. Phase II can be up to $2,000,000 including options and TABA.
When is the deadline?
The topic pre-released October 7, 2026, opens October 28, 2026, and closes November 25, 2026 at 12:00 p.m. ET in DSIP.
How long can the technical volume be?
Navy Phase I technical volumes are limited to 10 pages, with a 10-point minimum font, and the Phase I Option tasks must fit inside those 10 pages.
Why an intermediate temperature?
Running warmer water than the 42 F chilled water system uses less energy, reduces condensation hazards, and preserves power and cooling margin for future DDG 51 upgrades.
Can I talk to the topic author?
Yes, during pre-release only, from October 7 until the topic opens on October 28, 2026. After that, questions go through DSIP Topic Q&A.
The deadline for this opportunity has passed. Find open opportunities in our Non-Dilutive Funding Opportunities Database.