Executive Summary
DAF27BZ01-DV010 is a Department of the Air Force Direct-to-Phase II SBIR topic for a rugged, kilowatt-class 2-micron fiber amplifier with the size, weight and power of today's 1-micron systems. It suits small businesses with completed feasibility work. Proposals are due November 25, 2026, 12:00 PM ET.
The deciding factor is proof of prior feasibility. There are no Phase I awards, so you must document Phase I-type work, such as low SWaP, kilowatt-class 1-micron amplifier modules, that was not funded by earlier SBIR or STTR awards. Phase II ends with a delivered prototype verified above 1 kW.
Solicitation at a Glance
- Agency: Department of the Air Force (DAF)
- Topic: Low SWaP, 2-micron Fiber Amplifiers
- Number: DAF27BZ01-DV010, DoW SBIR FY27 Release 1
- Award Vehicle: SBIR Direct-to-Phase II (D2P2) award; no Phase I awards will be made
- Funding: No dollar amount is posted in the topic; check the DAF instructions for Release 1 on DSIP
- Technology Maturity: Completed Phase I-type feasibility work; Phase II builds and delivers a working prototype
- Projected CMMC Level: Level 2 (Self)
- Window: Pre-release from October 7, 2026; opens October 28, 2026; closes November 25, 2026, 12:00 PM ET
Think your company qualifies? Talk with BW&CO before the November 25 deadline.
What Is DAF27BZ01-DV010?
DAF27BZ01-DV010 is a Department of the Air Force SBIR topic released in the DoW SBIR FY27 Release 1. It is a Direct-to-Phase II topic, which means the Air Force skips Phase I and funds a Phase II effort for teams that have already shown feasibility. The topic's objective is to "develop and demonstrate a rugged, kilowatt class 2-micron fiber amplifier module that matches size, weight, and power metrics of state-of-the-art 1-micron systems." Its technology areas are Air Platform and Electronics, and its modernization priority is Directed Energy.
What Problem Is the Air Force Trying to Solve?
High-power fiber lasers in the 2-micron band offer eye-safer directed energy, advanced sensing and precision materials processing. Kilowatt-class, narrow-linewidth thulium-doped fiber amplifiers have been demonstrated, but they are still larger and heavier than mature 1-micron amplifiers. The Air Force wants to shrink existing 2-micron designs into a compact package and use existing Air Force laboratory architectures to prepare industry for production, so the technology can move into active directed energy programs.
Priority Capability Areas: What the Air Force Is Looking For
- Kilowatt-class output: laboratory-verified output power above 1 kW from a 2-micron fiber amplifier.
- Low SWaP: size, weight and power that comply with the low-SWaP requirements of state-of-the-art 1-micron fiber amplifiers.
- Beam and efficiency performance: laboratory verification of beam quality and electro-optical efficiency against the thresholds stated in the topic.
- Thermal management: heat removal in constrained operating spaces.
- Ruggedization: packaging that holds up in high-stress environments.
- Production path: a design that can move toward full-rate production and integration into a multi-kW laser defense system.
Funding and Award Terms
- Amount: the topic does not post a dollar amount. Phase II ceilings and period of performance are set in the DAF component instructions for this release on DSIP, so confirm them there before you build a budget.
- Phase: Direct-to-Phase II only. The topic states that "no Phase I awards will be made."
- Deliverables: the physical prototype, complete electrical and optical schematics, and a comprehensive test and characterization report.
- Phase III: transition into full-rate production, commercial market pathways and system-level integration into a deployable, multi-kW laser defense system.
Eligibility and Participation
- Applicant type: small business concerns that meet SBIR eligibility rules in the DoW SBIR BAA.
- Prior feasibility: offerors "must demonstrate completion of Phase I feasibility research and development that is not based upon or logically extend from any prior or ongoing federally funded SBIR or STTR work."
- Required understanding: documentation showing a clear understanding of high-power 2-micron amplifier design, thermal management in constrained spaces and package ruggedization.
- Qualifying work: the topic says qualifying Phase I-type efforts include, but are not limited to, prior design, development and demonstration of low SWaP, kilowatt-class, 1-micron fiber amplifier modules.
- Cybersecurity: the projected CMMC level is Level 2 (Self).
How to Apply
- Read the full package: the topic, the DoW SBIR FY27 BAA and the DAF component instructions for Release 1 on DSIP.
- Ask questions early: use the pre-release period and, once the topic opens on October 28, the DSIP topic Q&A.
- Document feasibility: show your Phase I-type results and explain why they were not funded by prior SBIR or STTR awards.
- Plan the build: lay out how you will reach above 1 kW, meet the beam quality and efficiency thresholds, and stay within 1-micron SWaP.
- Submit: certify and submit through DSIP by November 25, 2026, 12:00 PM ET.
What Happens After You Submit?
- Evaluation: the Air Force reviews proposals under the DoW SBIR BAA and DAF instructions for this release.
- Award: selected firms receive a Phase II award to build and deliver the prototype.
- Verification: the delivered hardware goes through laboratory verification of output power, beam quality and efficiency.
- Transition: successful work points toward full-rate production and integration into a multi-kW laser defense system in Phase III.
Is This Opportunity a Good Fit for Your Company?
It fits small businesses that already build high-power fiber lasers or amplifiers, especially teams with low SWaP, kilowatt-class 1-micron modules or thulium-doped fiber work, plus strong thermal and packaging skills. It is a weak fit for teams that are still at the concept stage or whose only feasibility data came from a prior SBIR or STTR award on the same work.
How BW&CO Can Help
BW&CO has helped deep-tech and dual-use founders secure more than $350M in non-dilutive funding. For Direct-to-Phase II topics like DAF27BZ01-DV010, we help you:
- Test the fit: check your prior work against the D2P2 feasibility rule.
- Frame the feasibility case: turn your 1-micron or thulium results into clear evidence.
- Build the technical volume: map your design to each performance threshold.
- Plan the budget: align cost and schedule with the DAF instructions for this release.
- Plan the transition: position for Phase III production and directed energy programs.
Plan Your DAF27BZ01-DV010 Submission
Frequently Asked Questions
Who issued DAF27BZ01-DV010?
The Department of the Air Force, as part of the DoW SBIR FY27 Release 1.
When is it due?
The topic opens October 28, 2026 and closes November 25, 2026, 12:00 PM ET.
How much money is available?
The topic does not post a dollar amount. Check the DAF component instructions for this release on DSIP for the Phase II ceiling and period of performance.
Is there a Phase I?
No. This is a Direct-to-Phase II topic, and no Phase I awards will be made.
What counts as prior feasibility?
Phase I-type work that is not based on prior or ongoing federally funded SBIR or STTR work. The topic gives prior low SWaP, kilowatt-class, 1-micron fiber amplifier modules as an example.
What must the prototype achieve?
Kilowatt-class output verified above 1 kW in the lab, with low SWaP in line with state-of-the-art 1-micron amplifiers, plus beam quality and efficiency verification.
What do I deliver at the end of Phase II?
The physical prototype, complete electrical and optical schematics, and a comprehensive test and characterization report.
What CMMC level applies?
The topic lists a projected CMMC level of Level 2 (Self).
Can BW&CO help with a DAF27BZ01-DV010 submission?
Yes. BW&CO helps teams document feasibility, map designs to the performance thresholds and build the Phase II proposal. Book a call with our team.
Source: DSIP: DAF27BZ01-DV010 Low SWaP, 2-micron Fiber Amplifiers